- Joined
- 5 Feb 2016
- Messages
- 9
- Reaction score
- 0
- Country
I have permission to build a two story extension, I also have a certificate of lawfulness for a hip to gable and rear dormer which comes to 49m3 (we are detached).
We know we have to do the roof changes and rear dormer first otherwise the roof on top of the side extension would have to be included in the 50m3 PD limit. Does anyone know how finished the roof has to be? Can it just be watertight e.g. windows and roof felt on but not titled?
Thanks in advance.
We know we have to do the roof changes and rear dormer first otherwise the roof on top of the side extension would have to be included in the 50m3 PD limit. Does anyone know how finished the roof has to be? Can it just be watertight e.g. windows and roof felt on but not titled?
Thanks in advance.