Why can't you just fix the PIR to the battens? That's what I did when applying PIR to the walls.
You could then use insulation washers (eBay) to hold the PIR to the battens, using normal screws.
250mm screws will be expensive and probably something like deck screws.
Are you fitting plasterboard over the top?
wall, PIR, battens, PIR infill, cross batten (service void), then PB
good point: Im confused by the need for 75mm battensYou could use 2 x 1 as the batten instead, 12.5mm plasterboard + 25mm batten + 50mm PIR + wall? 60mm... so a 150mm wood screw would do.
ah okI'm aiming for 125mm of insulation, so whether the infill is 25, 50 or 75mm the total depth to secure would remain the same?
No particular reason for the cross battening. If I was to stick 125mm PIR to the wall and then batten to be used as the service void too, I'd actually need to screw into 125 + 25.
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local