Hello All,
Out of curiosity, lets say you are running a twin and earth cable from the CU in conduit (up 2m into a ceiling), clipping it to a joist in an insulated loft, then inside capping down to a 'point', which method would you consider it ?
Thanks for any advice.
Out of curiosity, lets say you are running a twin and earth cable from the CU in conduit (up 2m into a ceiling), clipping it to a joist in an insulated loft, then inside capping down to a 'point', which method would you consider it ?
Thanks for any advice.