Hi I was wondering of you can help. I am planning on getting flagstones laid on the pictured grass area. Obviously I will need to cut the grass before removing it and the soil in preparation for hardcore sub base however I have been told I should hire a mini digger to do this as it is quite a large area however I came across a sod cutter,
Would this suffice in removing the area needed in preparation for a sub base and then of course the paving?
Thanks