Hi, I\\\'m converting a bedroom into an en-suite and main bathroom and need some guidance with the drainage. My idea is to connect bath, shower x 2 and basins x 2 waste for the two areas under the floor and run them all into one 32mm waste pipe which will finally run into a new vented stack. I have the clearance to create the relevant fall. Is this ok ? or should separate runs be created for each of the 5 units ?
Also is there any order in which the WC and bath etc waste outlets fix into the main stack ? to avoid any nasty smells. Thanks in advance.