I've been putting together a parts list for some wiring.
1 - 100A/100Ma T/delay DP RCD - £85
1 - 12 Way SL-CU /100A/DP 63A/30maRCD including mcb's - £74
1 - Wylex 110m/80 DP Switch Fuse - £31
How do these prices sound?
Other bits are bus bar, henley block connectors, armoured gland + banjo, resin joint, stuffing glands, connecctor blocks, junction box etc etc.
Earthing system is TT.
When I disconnect the elcb I assume the earth goes straight to the earth bar in the CU and then back to the banjo tab for the SWA?
Those are internet prices and hope to price the lot up tomorrow at the merchants.
What the best connection method for extending the cables from the property as the original spark 30 years ago left them a little short?
Is joining them even recommended?
When I'm all done I'll get my spark to test it all.
1 - 100A/100Ma T/delay DP RCD - £85
1 - 12 Way SL-CU /100A/DP 63A/30maRCD including mcb's - £74
1 - Wylex 110m/80 DP Switch Fuse - £31
How do these prices sound?
Other bits are bus bar, henley block connectors, armoured gland + banjo, resin joint, stuffing glands, connecctor blocks, junction box etc etc.
Earthing system is TT.
When I disconnect the elcb I assume the earth goes straight to the earth bar in the CU and then back to the banjo tab for the SWA?
Those are internet prices and hope to price the lot up tomorrow at the merchants.
What the best connection method for extending the cables from the property as the original spark 30 years ago left them a little short?
Is joining them even recommended?