I recently had my incoming fuse up graded to 100a from 60a and the cast iron cut out box replaced with a plastic one.
The earthing also upgraded to 16mm2 from 10mm2!!! from the outer sheath of the supply cable(lead) to the earth block, the to then terminal into my consumer unit.
The contractor however never gave me a test certificate nor did i see him perform a test apart from a polarity check before he inserted the fuse link.
Should he have performed an earth loop test at least?
any help would be great.
The earthing also upgraded to 16mm2 from 10mm2!!! from the outer sheath of the supply cable(lead) to the earth block, the to then terminal into my consumer unit.
The contractor however never gave me a test certificate nor did i see him perform a test apart from a polarity check before he inserted the fuse link.
Should he have performed an earth loop test at least?
any help would be great.