Hi folks,
I've got a situation where I want to knock down a garage/outhouse and build a new one adjoined to the building.
Trouble is the new foundations partially overlap the old ones (see image below).
Generally speaking is there any option other than to smash up and remove the old founds? Particularly on the northernmost strip where they run parallel and more or less on top of each other. It's about a 6m run.
If they do need smashed up, reckon it's at all practical by hand with a breaker? Or does it need a JCB with a breaker on the end?
Cheers,
Rich
I've got a situation where I want to knock down a garage/outhouse and build a new one adjoined to the building.
Trouble is the new foundations partially overlap the old ones (see image below).
Generally speaking is there any option other than to smash up and remove the old founds? Particularly on the northernmost strip where they run parallel and more or less on top of each other. It's about a 6m run.
If they do need smashed up, reckon it's at all practical by hand with a breaker? Or does it need a JCB with a breaker on the end?
Cheers,
Rich
