Good morning folks.
How far can a new gas supply from an external meter go vertical and then horizontal before going through the wall to a new boiler. Does it have to be protected with capping etc. I am a retired Joiner and all work will be carried out by qualified Gas Safe tradesmen. I would like the pipe to run about 3 metres up and 3 or 4 metres across is this doable within existing regulations.
Cheers...............
Chubbs.
How far can a new gas supply from an external meter go vertical and then horizontal before going through the wall to a new boiler. Does it have to be protected with capping etc. I am a retired Joiner and all work will be carried out by qualified Gas Safe tradesmen. I would like the pipe to run about 3 metres up and 3 or 4 metres across is this doable within existing regulations.
Cheers...............
Chubbs.
