Morning all,
Im after a little advise on installing pipework to an existing oil fired boiler.
I am replacing a rusty old tank with a plastic one in a new location so need to install new pipework. Im going with 10mm Qual pipe buried 400mm below ground but need to know where the pipe is exposed at both the tank end and the entry point to the building does this need change to PVC coated copper or can I just sleeve it or maybe put some Denso tape around ?
Any advice appreciated
Im after a little advise on installing pipework to an existing oil fired boiler.
I am replacing a rusty old tank with a plastic one in a new location so need to install new pipework. Im going with 10mm Qual pipe buried 400mm below ground but need to know where the pipe is exposed at both the tank end and the entry point to the building does this need change to PVC coated copper or can I just sleeve it or maybe put some Denso tape around ?
Any advice appreciated