Just having 2 large rooms celing skimmed. The plasterer has left without telling me what to do next! He said it was going off very quickly by which I assume he means it was drying faster than he'd perhaps expected.
Would I be right in thinking I shouldn't put the heating back on in those rooms tonight for fear of the plaster cracking?
Would I be right in thinking I shouldn't put the heating back on in those rooms tonight for fear of the plaster cracking?
