J
jeepster
hi all, we need a hole cutting in the brickwork to pass a basin waste through.
its at the front right hand corner of the building, the wall inc cavity are 300mm thick.
whats the closest we can drill the hole to the front corner of the building, plumber reckons its 18inches, so 18 inches back from the leading edge of the property.
its at the front right hand corner of the building, the wall inc cavity are 300mm thick.
whats the closest we can drill the hole to the front corner of the building, plumber reckons its 18inches, so 18 inches back from the leading edge of the property.