hi everyone,
been using this forum a lot, thanks for all the good advice posted! this is my first post, and it'll probably sound pretty silly, but here goes:
does a fcu for a boiler count as a point in the "no. of points served" column on a p.i.r.?
what about spurs (double sockets) on a ring circuit?
i would assume so, but the numbers don't tally with whats on the p.i.r. and i just want to confirm it (or not) before ranting and raving to the contractor who did the report.
thanks.
mumbley
been using this forum a lot, thanks for all the good advice posted! this is my first post, and it'll probably sound pretty silly, but here goes:
does a fcu for a boiler count as a point in the "no. of points served" column on a p.i.r.?
what about spurs (double sockets) on a ring circuit?
i would assume so, but the numbers don't tally with whats on the p.i.r. and i just want to confirm it (or not) before ranting and raving to the contractor who did the report.
thanks.
mumbley