I am replacing my bath however the new one sits lower so I need to reroute some pipework.
I was hoping to just cut the fitting off and reweld some new on however there doesn't look like I will have enough pipe left.
Is there such thing as an internal coupler?
There would be 20mm left coming out the floor if I cut that 1st coupler off but trying to avoid messing with the floor.
Anyone have any ideas how to can sort it? I maybe can't see the wood for the trees.
Picture attached.
I was hoping to just cut the fitting off and reweld some new on however there doesn't look like I will have enough pipe left.
Is there such thing as an internal coupler?
There would be 20mm left coming out the floor if I cut that 1st coupler off but trying to avoid messing with the floor.
Anyone have any ideas how to can sort it? I maybe can't see the wood for the trees.
Picture attached.