Hi,
I'm looking to upgrade my central heating system. Currently I have no immersion and thought I'd have one put in as a back up for if (when) the boiler breaks down one day in the future.
I have what I believe to be a split load consumer unit, but when I look every MCB is used with none spare. Does this mean adding an immersion will need a whole new CU upgrade (it doesn't look that old, but was fitted before we moved in 4 yrs ago)?
Will there be ways round this or do I need to also factor the cost of a new CU in too?
All advice appreciated.
I'm looking to upgrade my central heating system. Currently I have no immersion and thought I'd have one put in as a back up for if (when) the boiler breaks down one day in the future.
I have what I believe to be a split load consumer unit, but when I look every MCB is used with none spare. Does this mean adding an immersion will need a whole new CU upgrade (it doesn't look that old, but was fitted before we moved in 4 yrs ago)?
Will there be ways round this or do I need to also factor the cost of a new CU in too?
All advice appreciated.
