Hi all,
I have had a downstairs bathroom moved upstairs, I am now looking to make the old bathroom into an office, however, the old toilet plumbing system is still in place, I would have just taken it out but the kitchen is still plumbed in through the wall.
I have an idea but just wanted to ask if it is a viable option and see what you guys think, take a look at the images below (click for bigger size)...


...Looking at the second image, the idea is to place the pipe as far into the wall as possible and cut a hole in the floor along the red dotted line, then place the live pipe in the floor and seal it back in with a bit of concrete, the rest of the system would be cut flush to floor level and then capped off.
So what do you guys think? ...also I'm not sure how I'm going to cap it yet, maybe there is a standard sized cap for this kind of thing?
Thanks in advance.
I have had a downstairs bathroom moved upstairs, I am now looking to make the old bathroom into an office, however, the old toilet plumbing system is still in place, I would have just taken it out but the kitchen is still plumbed in through the wall.
I have an idea but just wanted to ask if it is a viable option and see what you guys think, take a look at the images below (click for bigger size)...


...Looking at the second image, the idea is to place the pipe as far into the wall as possible and cut a hole in the floor along the red dotted line, then place the live pipe in the floor and seal it back in with a bit of concrete, the rest of the system would be cut flush to floor level and then capped off.
So what do you guys think? ...also I'm not sure how I'm going to cap it yet, maybe there is a standard sized cap for this kind of thing?
Thanks in advance.