Hi, We are having the bathroom re-vamped and at present we have three pipes coming down
from the ceiling; 22mm Cold Feed to cistern and bath, 22mm Hot feed to bath, 15mm cold feed returning through wall to kitchen. The guy doing this job said he can do away with both the 22mm pipes as we are having the bath removed permanently and then he can run one pipe to feed the cistern and kitchen. Is that acceptable?
from the ceiling; 22mm Cold Feed to cistern and bath, 22mm Hot feed to bath, 15mm cold feed returning through wall to kitchen. The guy doing this job said he can do away with both the 22mm pipes as we are having the bath removed permanently and then he can run one pipe to feed the cistern and kitchen. Is that acceptable?