Looking for advice on the correct use of slate and a half in an open valley.
If we use slate and a half it gradually finds its way into the centre of the roof or would leave a straight join with the slate above. Using regular slates (20"x10") means there are some small cuts with not much room for nailing.
Which is the correct method?