Highly unlikely but do you think the property had two phases originally with maybe an earth terminal where the green disk is? I realise you have a TT system but the colour of the disks plus the "newer" cut-out below the green makes me wonder.

A theoretical possibility, but I don't think so - all four incoming cables have clearly been there 'for decades' (and FWIW all look identical, and are externally clipped together in pairs).Highly unlikely but do you think the property had two phases originally with maybe an earth terminal where the green disk is? I realise you have a TT system but the colour of the disks plus the "newer" cut-out below the green makes me wonder.
Yes, possibly. We are (were) talking about East Midlands Electricity Board - anyone out there familiar with any of their 3-phase supplies, and whether they have red/blue/green and/or A, B, C identification (or red neutralsThanks for the photo John, that makes it much clearer. I'd say that's almost certainly a case of the second possibility I mentioned then, i.e. of the local board using one of a variety of different identification schemes before red/white/blue became the standard.
Thanks. Are you suggesting that the inner insulation of the three phase conductors (which I can't see) are also probably all red? In addition to outlawing the visible inner insulation, do the 'current rules' also require some sort of visible identification of which conductor is which?The Red neutral is quite common on that type of cabling as the DNO do not want to carry 2 drums of cable about. If they were connecting up a whole street, it would be quite a lot to haul around. "Current" rules do state that no inner insulation should be showing though.
That's interesting - and not what I would have expected.They are most probably all the same colour
Fair enough, but I'm not talking of meter tails - but, rather, the incoming DNO feed. If all four incoming conductors have the same colour insulation, is there not a requirement for them to be labelled in some way - not the least to distinguish the neutral from the phase ones, even before we get to phase rotation?Our rules state that no inner insulation is showing, on some older equipment that is impossible, and all incoming tail's to the meter are labeled with one piece of tape and the outgoing tail's with 2 pieces of tape.
No.(also, the order R/B/Y would have been unusual, wouldn't it?):
I realise that, but thought (perhaps incorrectly) that it was much more common/conventional to wire things (e.g.those cutouts) in the RYB order.No. RYB indicates phase rotation, so you'd only have RYB labelling to the cutouts if the phases rotated left to right. If the cutouts got wired so that the rotation was from right to left, this would be indicated by swapping Y and B.(also, the order R/B/Y would have been unusual, wouldn't it?):
Before anyone makes comments about 'free electricity', the cables coming out of the supply side of the LH phase and N go to the meter of an adjacent property, which was once part of what is now my house!
You're a trusting lot, aren't you- I guess I should have pre-emptively mentioned those as wellOK but where are the cable from the outgoing side of L2 and the neutral going toBefore anyone makes comments about 'free electricity', the cables coming out of the supply side of the LH phase and N go to the meter of an adjacent property, which was once part of what is now my house!![]()
As for the tails going to you time clock, you are getting free electric as you are getting the potential for the clock before the meter![]()
I realised that but, like Paul, I assumed that was standard. After all, it's not 'my' clock (I presume it belongs to the meter operator) - and I would imagine that the last thing they would want me to be able to do would be to interfere with the supply to it. I suppose they could take it's feed direct from the meter, hence sealed, if there are any spare 'holes' left after all the phase in/out tails, and the feed from the clock, have been accommodated. The arrangements has remained as you see through at least two meter changes.As for the tails going to you time clock, you are getting free electric as you are getting the potential for the clock before the meterOn your next meter change, it will probably be altered
![]()
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local