I'm trying to figure out the pipework for our system but as its a back boiler I cant see where the pipe connections are. I also cant see much under the floorboards or in the adjoining cupboard where the cylinder is. I'm presuming the pipes must enter from the right hand side of boiler, would that be normal?
From what I've seen so far the pump is connected after one 2port valve which seems to conflict with every diagram of CH configurations I've seen. Does it make sense to anyone?
Is it possible that one valve is used to shut off the entire system and then the 2nd valve (presumably after the pump) just controls the flow to the cylinder?
thanks
From what I've seen so far the pump is connected after one 2port valve which seems to conflict with every diagram of CH configurations I've seen. Does it make sense to anyone?
Is it possible that one valve is used to shut off the entire system and then the 2nd valve (presumably after the pump) just controls the flow to the cylinder?
thanks
