Hoping that i can get a good steer on this one,
My palanning application as a condition being that
"the dwelling permitted will be constructed to achieve a minimum code for sustainable homes level 3, and achieve a minimum of 1 credit under category ENE1 Dwelling emission rate"
Another condition is that construction of the dwelling should not be started until a interim certificate has been submitted certyfying that a minimum code for sustainable homes level 3 and a minimum credit under ENE dwelling emmision rate as been achieved.
I aim to tackle this myself, is this possible. I can ceratinly trawl through technical advice jargon, and ultimately build the houdse to the required standard, but what about certificates!!
Hope someone may be able to help get me started.
Thanks all
My palanning application as a condition being that
"the dwelling permitted will be constructed to achieve a minimum code for sustainable homes level 3, and achieve a minimum of 1 credit under category ENE1 Dwelling emission rate"
Another condition is that construction of the dwelling should not be started until a interim certificate has been submitted certyfying that a minimum code for sustainable homes level 3 and a minimum credit under ENE dwelling emmision rate as been achieved.
I aim to tackle this myself, is this possible. I can ceratinly trawl through technical advice jargon, and ultimately build the houdse to the required standard, but what about certificates!!
Hope someone may be able to help get me started.
Thanks all