Hi, I have just taken down a door frame, dimensions 300mm x 2000mm.
This has exposed brickwork and above the door frame are loads of plaster bags stuffed in to pack it out
I want to get this plastered over with no door to be replaced, how long would it take to do a job like this?
attached a pic also
This has exposed brickwork and above the door frame are loads of plaster bags stuffed in to pack it out
I want to get this plastered over with no door to be replaced, how long would it take to do a job like this?
attached a pic also