We are replumbing an entire house, rads, hot water etc, due to a major renovation. (ripping out all the existing old system, copper, rads etc)
Builder suggests using poly-pipe rather than copper for all the CH, with final copper ends up to the new (as yet un-chosen) rads.
Is this the correct modern way to do it, only ever lived in, and dealt with, copper plumbing before.
Any there any issues to be aware of?
Thanks all.
Builder suggests using poly-pipe rather than copper for all the CH, with final copper ends up to the new (as yet un-chosen) rads.
Is this the correct modern way to do it, only ever lived in, and dealt with, copper plumbing before.
Any there any issues to be aware of?
Thanks all.