Just wondering how long a powerflush should take, BG told me at least a day when I had a quote from them. I had a boiler installed by an independent and they booked it in as a 2.5 day job. At the start of the 3rd day it hadn't been powerflushed (though it was up and running) due to the flush machine not being available. Obviously I have no way to ensure that the flush happened, but assuming they actually stopped for only half a day was that long enough to flush correctly? The benchmark is filled in to say it was done along with inhibitor. Is there any way I can tell if the flush was done and inhibitor installed?
