Hi all,
I'm doing a bathroom refit. When gutting the existing tiles, I'm left with quite a lot of areas that need patching/building up before tiling. I've also got a couple of small bare brick areas where I'm removed old boxing.
I don't really have the time to plaster and wait before tiling. Are there any techniques or quick drying products anyone would recommend to build the wall out?
Thanks
Jon
I'm doing a bathroom refit. When gutting the existing tiles, I'm left with quite a lot of areas that need patching/building up before tiling. I've also got a couple of small bare brick areas where I'm removed old boxing.
I don't really have the time to plaster and wait before tiling. Are there any techniques or quick drying products anyone would recommend to build the wall out?
Thanks
Jon