Hi All,
I've had a few quotes to put down 38sqm of engineered oak flooring on to a 6 week old concrete slab.
Two of them were £750 to float the boards straight on, one was £1,140 to apply sealer/primer throughout and also stick the boards down with adhesive.
Is it generally best to stick the engineered stuff down rather than float, and how do the quotes sound?
I've had a few quotes to put down 38sqm of engineered oak flooring on to a 6 week old concrete slab.
Two of them were £750 to float the boards straight on, one was £1,140 to apply sealer/primer throughout and also stick the boards down with adhesive.
Is it generally best to stick the engineered stuff down rather than float, and how do the quotes sound?