Pressure relief pipe work on Biasi 32HE

It would appear that satandard good practice and as used in G3 are wrong in some cases.

G3 states termination at high level is acceptable into metal hoppers or flat roofs.
At no point is the discharge allowed to be returned against a wall regardless of height.
A maximum gap of 100mm is required from hard standings.
Pipework exiting below 2m should have caging considered as to the pipe becoming hot.

That aside i am intrested in PRV's on boilers and where people are getting heights etc from these discharge far smaller amounts of water at lower temp than the TPRV of an unvented and the only info i can find relates to ensuring the discharge doesnt cause risk of injury ie over window/doors or discahrge directly out of pipe ends.
 
Sponsored Links

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top