Site set up
Fence off and protect car parking area with polythene and ply ready for skips
Health and safety
Preliminary’s
Rubbish and wait and loads
Clear away and builders clean on completion
Strip out
Remove partitions, garage door and track, existing boiler cupboard doors
Remove hot water cylinder and associated pipework
Excavate floor, remove concrete slab and reduce levels by 500mm
leave ready for build up
Form opening side wall for French doors and side lights and fix catnic
support to take brick soldier course
Form opening side wall for window and fit catnic support to take brick soldier course
Extend opening from lobby to new bedroom to take wider door and frame
Remove patio slabs and set aside, remove base to form level access
from new French doors
Reinstate floor with 1200 gage DPM, 150mm hardcore, 100mm insulation,
70mm screed leaving an allowance for 25mm for tiles and adhesive
Allow for pipes supplied in floor and wall for a radiator to be fitted in future
Supply and fit 100mm Celotex insulation between ceiling joists and 50mm insulated
plasterboard to underside
First and second fix electrics
6 No. downlights 2 way
4 double sockets
Light above bed
External sensor light to outside door
Fuse spur for underfloor heating
4 No. remote sockets
Supply and fit 150mm insulation to side wall and 200mm to all external walls
Plasterboard to ceiling and plaster
Plaster board to all walls and plaster
Box in soil pipe and soundproof, plasterboard and plaster
Fit skirting to match existing to all new walls
Joinery
All windows, external doors and frames in Accoya hardwood
Support and fit bespoke French doors with side lights and windows
New door and frame from lobby to new bedroom all to match existing
Timber French doors and frame, double glazed
Timber casement window double glazed, all to match existing
New timber garage door to be fixed on external side of insulation to front elevation
Fix 6mm luxe board cementitious insulation board to floor screed
Supply and fit electric underfloor heating to complete floor
Supply and fit 600mm x 600mm porcelain tiles to complete bedroom floor
Making sure all thresholds through doorways are level access
Adapt patio and tiling to form level access from French doors
Full decorations to ceiling, walls and all woodwork using vinyl matt to ceiling and
washable emulsion to walls, satin to all woodwork
Fully decorate all external walls to new bedroom in 2 No. coats of masonry paint,
undercoat and 2 No. full gloss to window and door. Stain varnish or undercoat and 2 No. gloss to new garage door
Make opening through wall to get new hot water cylinder above ceiling in lobby,
strengthen and renew ceiling joist to take weight of new hot water cylinder
Re-plumb new hot water cylinder and associated pipework
Site set up
Fence off and protect car parking area with polythene and ply ready for skips
Health and safety
Preliminary’s
Rubbish and wait and loads
Clear away and builders clean on completion
Strip out
Remove partitions, garage door and track, existing boiler cupboard doors
Remove hot water cylinder and associated pipework
Excavate floor, remove concrete slab and reduce levels by 500mm
leave ready for build up
Form opening side wall for French doors and side lights and fix catnic
support to take brick soldier course
Form opening side wall for window and fit catnic support to take brick soldier course
Extend opening from lobby to new bedroom to take wider door and frame
Remove patio slabs and set aside, remove base to form level access
from new French doors
Reinstate floor with 1200 gage DPM, 150mm hardcore, 100mm insulation,
70mm screed leaving an allowance for 25mm for tiles and adhesive
Allow for pipes supplied in floor and wall for a radiator to be fitted in future
Supply and fit 100mm Celotex insulation between ceiling joists and 50mm insulated
plasterboard to underside
First and second fix electrics
6 No. downlights 2 way
4 double sockets
Light above bed
External sensor light to outside door
Fuse spur for underfloor heating
4 No. remote sockets
Supply and fit 150mm insulation to side wall and 200mm to all external walls
Plasterboard to ceiling and plaster
Plaster board to all walls and plaster
Box in soil pipe and soundproof, plasterboard and plaster
Fit skirting to match existing to all new walls
Joinery
All windows, external doors and frames in Accoya hardwood
Support and fit bespoke French doors with side lights and windows
New door and frame from lobby to new bedroom all to match existing
Timber French doors and frame, double glazed
Timber casement window double glazed, all to match existing
New timber garage door to be fixed on external side of insulation to front elevation
Fix 6mm luxe board cementitious insulation board to floor screed
Supply and fit electric underfloor heating to complete floor
Supply and fit 600mm x 600mm porcelain tiles to complete bedroom floor
Making sure all thresholds through doorways are level access
Adapt patio and tiling to form level access from French doors
Full decorations to ceiling, walls and all woodwork using vinyl matt to ceiling and
washable emulsion to walls, satin to all woodwork
Fully decorate all external walls to new bedroom in 2 No. coats of masonry paint,
undercoat and 2 No. full gloss to window and door. Stain varnish or undercoat and 2 No. gloss to new garage door
Make opening through wall to get new hot water cylinder above ceiling in lobby,
strengthen and renew ceiling joist to take weight of new hot water cylinder
Re-plumb new hot water cylinder and associated pipework