I had a Combi system fitted about 6 years ago and at the time the fitter told us that plastic piping was the best, However we have just had a service done and we were told that the pipes were not up to standard and could affect our CH cover as they let air into the system.
We do have a problem with air getting into the system as we have to recharge the system every few weeks and we also have a problem with our living room radiators where the rads heat at the top but not at the bottom until the heating has been on for some time. When the heating is first switched on it can take an hour or so before the heat is distributed to even the first (main) rad in the system.
How much would it roughly cost to re-pipe the system with like copper or whatever is standard now. we have 9 rads in the house.
We do have a problem with air getting into the system as we have to recharge the system every few weeks and we also have a problem with our living room radiators where the rads heat at the top but not at the bottom until the heating has been on for some time. When the heating is first switched on it can take an hour or so before the heat is distributed to even the first (main) rad in the system.
How much would it roughly cost to re-pipe the system with like copper or whatever is standard now. we have 9 rads in the house.
