Hello All,
its Alex the semi-self builder (still enjoying the project)
My plasterers start on Monday & they will also be screeding the floor.
They don't want to work on top of the 70mm EcoTherm foil backed insulation, so we have agreed that I will fit it during the evening, the night before they plan to screed. This will then be inspected the following morning by Building Control before they start.
I need to get this right first time so as not to waste anyones time.
I assume, it is just a case of cutting to size and laying the insulation on the floor, job done
if anyone knows of anything else that I need to bear in mind, I would be grateful for any tips.
Many thanks in advance,
Alex.
its Alex the semi-self builder (still enjoying the project)
My plasterers start on Monday & they will also be screeding the floor.
They don't want to work on top of the 70mm EcoTherm foil backed insulation, so we have agreed that I will fit it during the evening, the night before they plan to screed. This will then be inspected the following morning by Building Control before they start.
I need to get this right first time so as not to waste anyones time.
I assume, it is just a case of cutting to size and laying the insulation on the floor, job done
if anyone knows of anything else that I need to bear in mind, I would be grateful for any tips.
Many thanks in advance,
Alex.