But with an R1+R2 test all your doing is putting a conecting conductor between the live and earth at the cu?
What other dismantling takes place?
Well for a lighting circuit you would need to either take the cover off a fitting, find a ceiling rose and remover the cover or drop a switch front off to connect your meter accross line and the CPC.
With an R2 wander lead, you just touch it onto a metal part of the light fitting, or the fixing screws of a light switch. Much quicker.
You can also get telescopic poles with an R2 probe on the end for testing hard to access fittings such as at high level in factories without the need to build a scaff tower etc.