I've got an old Gloworm Swift Flow combi boiler that is hanging on in there at about 13 yrs old!! I've noticed that recently the pressure creeps up from about 1 bar to 2 bar when the heating comes on, so I believe the Pressure Vessel needs recharging.
I last did this about 2 yrs ago. Is this a reasonable time between charges, or should it last longer than this?
Thanks, TT
I last did this about 2 yrs ago. Is this a reasonable time between charges, or should it last longer than this?
Thanks, TT