I'm thinking of not installing the right hand beam, its only a span of about 1 metre, and the dormer wall will sit on the exsiting wall plate.
Looking at all the loft installations around here that is exactly how they are being put together.
Would I need to trim around the windows with double joists ? to satisfy BC (that isn't what I see though, builders rest two 100x 50 timbers onto of the existing ceiling joists, and use that as a new plate.
Bear in mind the plans below been a approved by building control, would this need justifying by new calcs - how do the other loft extensions know the strength of the old existing lintels - I'm sure their architects dont look at whats there.
View media item 48354
Looking at all the loft installations around here that is exactly how they are being put together.
Would I need to trim around the windows with double joists ? to satisfy BC (that isn't what I see though, builders rest two 100x 50 timbers onto of the existing ceiling joists, and use that as a new plate.
Bear in mind the plans below been a approved by building control, would this need justifying by new calcs - how do the other loft extensions know the strength of the old existing lintels - I'm sure their architects dont look at whats there.
View media item 48354
