We recently had a leak which caused our walls around our bath to be water damaged.
It has hay insulation (early 70's house). I called a builder who gave me a quote, but am not entirely sure on the length of time it would take.. hes quoted me for 7 days to remove walls... 1 wall 1700x2000 and the other 800x2000.
I know hes got to build the frame, then replasterboard the walls, and then skim but is 7 days a little excessive?.. its not a load bearing wall or anything like that.
It has hay insulation (early 70's house). I called a builder who gave me a quote, but am not entirely sure on the length of time it would take.. hes quoted me for 7 days to remove walls... 1 wall 1700x2000 and the other 800x2000.
I know hes got to build the frame, then replasterboard the walls, and then skim but is 7 days a little excessive?.. its not a load bearing wall or anything like that.