Well, even though I had a minor "event" re: my old CH boiler on Monday, I still managed to get in touch with the Local Council to ask them the procedure for notifying tham about the works I want to do with my wiring.
I don't know if the person I spoke to was on drugs or summat but basically, they told me to do the work, catalogue it all, then contact them again and they will send someone down to inspect it
This doesn't sound right to me, surely they would be wanting to send someone down first to check the existing installation, then another visit to check all my work was within the regs etc ? And also, no mention was made of any fees.
D'ya reckon someone has dropped off here & I should ring them again or do some councils do that ? I'm sure I was told that i would get two visits from some council bod a while ago.
Cheers
I don't know if the person I spoke to was on drugs or summat but basically, they told me to do the work, catalogue it all, then contact them again and they will send someone down to inspect it
This doesn't sound right to me, surely they would be wanting to send someone down first to check the existing installation, then another visit to check all my work was within the regs etc ? And also, no mention was made of any fees.
D'ya reckon someone has dropped off here & I should ring them again or do some councils do that ? I'm sure I was told that i would get two visits from some council bod a while ago.
Cheers