I have some questions for the following work:
1. New fuse board
2. New electrical sockets (4 x double-sockets per room in 4 rooms)
3. New wiring for lights
4. New light switches
5. Two lengths of Cat-6 in living room + 3 bedrooms
6. Extractor fan in bathroom
7. Power and lighting in loft
8. Power and lighting in attached garage
9. Security lighting front and back of property
10. Smoke and CO sensors
11. External power sockets
What would typical costs be for the above (just a ballpark figure to nearest thousand pounds), how long would it take and would the electrician lift up floorboards and loft materials as required to do the job or would I have to have all the floorboards in the house lifted up prior to the job commencing?
1. New fuse board
2. New electrical sockets (4 x double-sockets per room in 4 rooms)
3. New wiring for lights
4. New light switches
5. Two lengths of Cat-6 in living room + 3 bedrooms
6. Extractor fan in bathroom
7. Power and lighting in loft
8. Power and lighting in attached garage
9. Security lighting front and back of property
10. Smoke and CO sensors
11. External power sockets
What would typical costs be for the above (just a ballpark figure to nearest thousand pounds), how long would it take and would the electrician lift up floorboards and loft materials as required to do the job or would I have to have all the floorboards in the house lifted up prior to the job commencing?