How do you know it's the chippies fault?Which direction are the prevailing winds from. It comes out at 13.8725, but as they are only guaranteed to 15 degrees, you're outside the acceptable range. If you hadn't battened it, I'd have suggested increasing the overlap to about 110mm, but this is the chippies fault, so he either needs to redo it, or indemnify you for any future problems that may occur. It should have been a rise of 45 inches.
This is the sort of thing I do.... then later go on to regret.It’s a shame as I have already battened it as I could increase over lap.
Very tricky to no to go ahead and Tile it!
Cheers again
The chippy done the rise to the maximum he could due to upstairs windows. He done the max even so it only has a 75ml upstand of lead flashing.
It’s a shame as I have already battened it as I could increase over lap.
Very tricky to no to go ahead and Tile it!
Cheers again
If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Are you a trade or supplier? You can create your listing free at DIYnot Local