PIR on an existing installation. How can we confirm definately that all cables are routed in prescribed zones or with necessary mechanical protection when they are out of sight in the fabic of building ??? Not 100% happy ticking this box on this job. Do you guys put it down as a LIM if not totally sure ?[/b]