I have quite a bit of rubble/chipped slab pieces and old concrete that are solid and want to incorporate into my subbase rather than disposing of.
For my subbase I'm basically laying concrete, but wonder whether I should mix this into the mix itself or should they be on the "bottom" whereby then I just sort of pour and compress dry mix on top if that makes sense?
Thanks.