e.g: http://www.bruggpipesystems.co.uk/calpex_pipe.php
The sewer has head next door so is very close to the surface. It's all clay pipes.
Is there a procedure for this, or is it just a case of filling the gap between the two pipes with plenty of the appropriate granular fill (as you would when laying new pipes)?
Obviously I will be informing building control, but wanted to find out if this is a job for a contractor, or I can do it myself.
Many thanks,
S.
The sewer has head next door so is very close to the surface. It's all clay pipes.
Is there a procedure for this, or is it just a case of filling the gap between the two pipes with plenty of the appropriate granular fill (as you would when laying new pipes)?
Obviously I will be informing building control, but wanted to find out if this is a job for a contractor, or I can do it myself.
Many thanks,
S.