I need to run water and central heating pipes in the insulation under the screed in a barn conversion. How do I tee off given that joints must be accessible. This must be a common problem in barn conversions.
If theres not too many i tend tun run them all back to one place in plastic (yuk) as theyre reasonably well suited to that and have all the connections on a manifold
Unless you are planning to concrete over the joints then they will be accessible. To a degree!
The main priority is to pressure test all joints using a hydrostatic test procedure for the given pipe material.
If you are in any doubt though or doubt your ability to attain sound leak free joints then the manifold method as suggested above would probably be a better option.
Use 15mm for the rads.
If you had a 2kw radiator at the end of a 125m flow run and 125m on the return using 15mm pex with a standard 6m head circulator then that would be considered a bit excessive by most plumbers.
Generally on most domestic installations you will have pipe runs using 15mm that will be well within the range of most domestic circulators.
If you need to find a tradesperson to get your job done, please try our local search below,
or if you are doing it yourself you can find suppliers local to you.
Select the supplier or trade you require, enter your location to begin your search.
Please select a service and enter a location to continue...
Are you a trade or supplier? You can create your listing free at DIYnot Local