S-plan pipe run for loft mounted cylinder

Joined
24 Sep 2012
Messages
9
Reaction score
0
Location
Middlesex
Country
United Kingdom
The cylinder has been moved into the loft and boiler is still on the ground floor, is there a clear option for where the control gear should be? I can see advantages and disadvantages to both. Thanks in advance.
 
Sponsored Links
I would leave it as it is and just extend pipework, unless there was a very good reason to move it,
 
Sponsored Links
My spidey senses tell me the op is referring to the location of the valves. I would put them down by the boiler.

Yes, sorry the OP wasn't clear. I will doing the pipe work in readiness for a boiler/ system upgrade.. The cylinder is in place, just trying to decide on the location of the valves & pump.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top