I am feeling defeated. I have dug out the old concrete floor in my house. Laid a new concrete floor, dpm etc, then installed wet ufh pipes on celotex. At this stage i thought i would shell out and get a floor screeding specialist to put the final finish on. After showing him what height the finished floor should be he has done his own thing and left me with a finished screed 20mm too high.
I have called the chap and he refuses too even come back and look at the job. Now he just keeps hanging up on me. Can anyone advise whether i can get over this with a floor grinder/sander and if so what type? Obviously if it wasn't for the underfloor heating pipes i would just dig it up. Thanks in advance.
I have called the chap and he refuses too even come back and look at the job. Now he just keeps hanging up on me. Can anyone advise whether i can get over this with a floor grinder/sander and if so what type? Obviously if it wasn't for the underfloor heating pipes i would just dig it up. Thanks in advance.