Screeding upto UPVC door cills

Joined
21 Feb 2017
Messages
2
Reaction score
0
Country
United Kingdom
Hello
I'm in the process of screeding my conservatory floor
It already has a rough and bumpy concrete slab the builder half finished before going bankrupt (long story don't ask)
its roughly 3.33 x 2.80 meters square and I want it 40 mm thick at a 4:1 mix, by a calculator its suggesting 21 bags of sharp and 7 cement which seems a lot but for the area but hell ill go with it.
anyway
1/ will i have to paint the slab with a acrylic primer agent like setcrete first ,some people have said yes other have said not to bother

2/ will i need to add a Plasticiser as the sand will be very wet already. Getting in 25 kg bags from wicks

3/ There are two door cills which I need to chop out as my 40 mill will be above these one is wood the other UPVC, these were two external doors on different walls now enclosed inside the conservatory my question is .. can i screed right up to the bottom of the door frames or do i leave a few mm gap, i'm worried about these expanding at different rates to the screed and tiles when the weather is better.

Thank you for any help or suggestion all warmly received
 
Sponsored Links
As the screed is thin, then a primer or a cement slurry should be used to bond the screed and slab. Consider adding fibres too, as it might dry too quickly being that thin.

No plasticiser in screed. And it needs to be almost dry when it comes out the mixer or you will never get it flat and smooth.

Screed right up to the frames.
 

DIYnot Local

Staff member

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Sponsored Links
Back
Top