Shed Termination

My preffered option would be to have the SWA come up through the floor and terminate inside.

Failing that, PVC conduit through the wall between the external box and the CU.
 

If you need to find a tradesperson to get your job done, please try our local search below, or if you are doing it yourself you can find suppliers local to you.

Select the supplier or trade you require, enter your location to begin your search.


Are you a trade or supplier? You can create your listing free at DIYnot Local

 
Back
Top