Hi All,
I just wanted to know whether if one is changing floor joists + floorboards in a bathroom if a DPC roll is required between the joists and the wall.
The bathroom suffered from dry rot and previous water leak. Once new joists are fitted + floorboard, cement board will be installed and tiling installed as well.
Lastly, is it possible to have some kind of antifungal treatment on the bathroom walls, the walls will be re-plastered before tiling ?
Is a flexible adhesive/grout also required here ?
Thanks in advance.