- Joined
- 17 May 2012
- Messages
- 10,783
- Reaction score
- 849
- Country
Moving the kitchen, so this is hot water to the kitchen from boiler, cold water back from the mains, and the mains (L-R).
Hot water is already dropping a little bit. This end will be covered with wooden floor, but the other end will be covered in concrete - although I can ask for an access hatch. But, replacing it later would be very costly and messy, as I'd have to get the floor dug up and kitchen removed!
(Sink is temporary until floor put in)
I am wondering if it is supposed to all be temporary, but not sure why they'd do it like that if it was.
Hot water is already dropping a little bit. This end will be covered with wooden floor, but the other end will be covered in concrete - although I can ask for an access hatch. But, replacing it later would be very costly and messy, as I'd have to get the floor dug up and kitchen removed!
(Sink is temporary until floor put in)
I am wondering if it is supposed to all be temporary, but not sure why they'd do it like that if it was.
Last edited: