Hi all
Im fitting my first shower tray but have a couple of questions. I have over-boarded my floorboards with 12 WBP ply.
1) I've been advised to use driwall adhesive or sand/cement. Would you guys agree with this?
2) when you place the adhesive/sand/cement on the floor do you put dabs on or do you spread it across the ply? how thick do you put it on?
3) On the underneath of the shower tray there is a recessed area near the edge, all the way round. Im assuming i dont put any adhesive or sand/cement in here? Do i put some on the outside edge?
Many thanks
Im fitting my first shower tray but have a couple of questions. I have over-boarded my floorboards with 12 WBP ply.
1) I've been advised to use driwall adhesive or sand/cement. Would you guys agree with this?
2) when you place the adhesive/sand/cement on the floor do you put dabs on or do you spread it across the ply? how thick do you put it on?
3) On the underneath of the shower tray there is a recessed area near the edge, all the way round. Im assuming i dont put any adhesive or sand/cement in here? Do i put some on the outside edge?
Many thanks