- Joined
- 5 Dec 2012
- Messages
- 927
- Reaction score
- 13
- Country
Just installed new 22mm chipboard and part of me is saying to put down ply so I don't regret it in the future (just for shower area).
Can I get away with bedding the shower tray straight onto 22mm chipboard. If so, what do I seal the floor with first?
If I go down the ply route, is 12mm ply screwed ON TOP OF chipboard ok, or do I need to remove the chipboard and screw down 18mm?
Cheers
Can I get away with bedding the shower tray straight onto 22mm chipboard. If so, what do I seal the floor with first?
If I go down the ply route, is 12mm ply screwed ON TOP OF chipboard ok, or do I need to remove the chipboard and screw down 18mm?
Cheers