Building a 26m long 400mm high sleeper retaining wall from 2.4m x 100mm x 200mm pressure treated timber. The sleepers will be placed 2 high on their 100mm faces then I want to concrete in vertical sleeper posts every 2.4m at the joins to retain the sleepers. My question is what dimension of hole should I dig and will one third of the sleeper height below ground be enough. 600mm vertical sleeper with 200mm concreted into the ground?